CHIEF NAWS1 User Manual

Page 5

Advertising
background image

Installation Instructions

NAWS1

5

3.

Drill four 5/16" (7.9mm) pilot holes at points marked in Step
2. (See Figure 2)

4.

Install an anchor (not included) into each pilot hole. (See
Figure 2)

5.

Use four 5/16 x 2-1/2" lag bolts (not included) and four 5/16"
flat washers (not included) to attach shelf to wall. (See
Figure 2)

Figure 2

3

4

2

x 4

x 4

5

x 4

Advertising