Caution, Start-up – AAON V3-E User Manual

Page 15

Advertising
background image

15

4. Start-Up

General








ONLY QUALIFIED, AUTHORIZED PERSONNEL
SHOULD POWER ON, OR START-UP THIS
EQUIPMENT.

The use of common sense, and good practice in the
installation, and start-up of equipment will prevent
many potential problems with the system in the future.

Before starting up the equipment, building construction
should be complete, and start-up personnel should:

− Have a working knowledge of general HVAC

and mechanical commissioning procedures
and practices;

− Be familiar with unit functions, features,

optional unit accessories, and all control
sequences;

− Have appropriate literature on hand for

consultation.












Before the structure is occupied, the installation,
and/or start-up personnel must take three essential
steps:

1. Check

Out

2. Start-Up
3. Commissioning

Check Out


Equipment should be thoroughly checked for loose
wiring, a free spinning blower wheel, and well fitting
access panels. Air handlers should not be operated

without proper ductwork and access panels installed,
except as required during start-up and air balancing.

1. Check all electrical connections to be sure

they are tight.

2. Open all access panels, and remove all

shipping screws, or restraints.

3. Clean out any debris that may have been left.
4. Check belt alignment, and tightness of fan

drives.

5. Check bearing locking collars, and fan wheel

set screws for tightness.

6. Turn fan wheels to assure free rotation.
7. Ensure electrical supply matches the unit

nameplate.

8. Ensure condensate lines are connected, and

glued.

9. Check local codes for any special provisions.
10. Replace, and/or close all access panels.
11. Ensure that return, and/or supply dampers in

ductwork are open.

12. Check electrical phasing to ensure fan rotates

in proper direction.

Procedures









Install gauges, voltmeter, and ammeter before start-
up. Observe refrigerant pressures during initial
operation. Note, and determine the cause of any
excessive sound, or vibration. Follow start-up
procedures outlined below to start each piece of
equipment.








Electric Heating Section Procedures

1. Perform final visual inspection. Check all

equipment, ductwork, and piping to verify that
all work is complete, and equipment is
properly installed and mounted. Improperly
installed equipment, or ductwork can affect
readings.

Failure to adhere to the following start-up
procedures will void all manufacturer’s warranties.

NOTE

Completed factory test sheets are in the equipment
literature packet shipped inside the unit. Factory
run-test readings recorded on the test sheets for
may be helpful to reference during start-up.

NOTE

Equipment power should be on at least 24 hours
before start-up to allow the crankcase heater to
boil off refrigerant that may have accumulated in
the compressor oil.

CAUTION

Equipment operation during construction is not
recommended. Construction site pollution can
affect unit operation, and seriously degrade
performance. Operation during construction will
void all manufacturer’s warranties.

CAUTION