Condenser and Condenser Unit Startup Form

Date:______________
Job Name:_____________________________________________________________________
Address:______________________________________________________________________
Model Number:_________________________________________________________________
______________________________________________________________________________
Serial Number:_____________________________________________ Tag:_______________
Startup Contractor:______________________________________________________________
Address:__________________________________________________ Phone:_____________

Pre Startup Checklist

Installing contractor should verify the following items.

1. Is there any visible shipping damage?

Yes

No

2. Is the unit level?

Yes

No

3. Are the unit clearances adequate for service and operation?

Yes

No

4. Do all access doors open freely and are the handles operational?

Yes

No

5. Have all shipping braces been removed?

Yes

No

6. Have all electrical connections been tested for tightness?

Yes

No

7. Does the electrical service correspond to the unit nameplate?

Yes

No

8. On 208/230V units, has transformer tap been checked?

Yes

No

9. Has overcurrent protection been installed to match the unit nameplate
requirement? Yes

No

10. Have all set screws on the fans been tightened?

Yes

No

11. Do all fans and pumps rotate freely?

Yes

No

12. Is all copper tubing isolated so that it does not rub?

Yes

No


Ambient Temperature
Ambient Dry Bulb Temperature ________°F

Ambient Wet Bulb Temperature ________°F


Compressors / DX Cooling

Compressor

Number

L1 L2 L3

Head

Pressure

PSIG

Suction

Pressure

PSIG

Crankcase

Heater

Amps

1
2
3
4
5
6
7
8