Draw-Tite 58507 DUAL CAM HP ACCESSORY User Manual
Rivet nut

Rivet nuts
½” hex head bolts
with lock washers
Long ½”
bolt
1.
Place the dual cam bracket on the
frame at the correct spot for your
installation. See dual cam instructions.
2.
Use the long ½” bolt to clamp the
bracket in position.
3.
Using the holes in the bracket as a
guide, drill two 7/16” holes into the
frame.
4.
Remove the bracket and drill the
holes out to 11/16”. Do not ream out
the hole. This needs to be a snug fit.
5.
Put the Rivet Nuts into the holes in
the frame.
6.
Place the bracket over the rivet nuts,
thread the ½-13 x 1-1/2 hex head
bolts with lock washers into the holes.
Finger tight only.
7.
Tighten the long ½” bolt against the
frame, ½ turn after contact with the
frame.
8.
Tighten the ½” bolts on the outside of
the frame.
9.
If the Rivet nut spins in the hole,
tighten the long ½” bolt more.
10. Torque to 75 ft. lbs.
Rivet
Nut
Installation Instructions
For installing the rivet nut in a tube frame.
©
2013 Cequent Performance Products, Inc.
Sheet 1 of 3
58507N
10/17/13
Rev. B