4 commissioning, 5 stopping the boiler, Precautions to take if there is a danger of frost – DE DIETRICH ELITEC DTG 130 User Manual

Page 9: Commissioning, Stopping the boiler

Advertising
background image

9

20/02/09 - 300004565-001-C

DTG 130

4. Commissioning

4 Commissioning



Initial commissioning must be done by a qualified
professional.

1. Check the water pressure in the installation. Top up with more

water if necessary.

2. Open the gas valve.

3. Check that the safety thermostat has not triggered. Remove the

safety thermostat hood and press the reset button with a
screwdriver.

4. Control panel B:

- Set the Summer/Winter swtich to

.

Control panel E/E1/D:
- Set switch

AUTO/

!

to the AUTO position.

5. Set the On/Off switch to

8

.

6. The safety box carries out its ignition cycle.

5 Stopping the boiler

Set the On/Off switch to

7

.



On the Off position

7

, the domestic hot water calorifier

fitted with a titanium anode is not protected against
corrosion.

Precautions to take if there is a danger of frost

Heating circuit:
Use a correctly dosed antifreeze to prevent the heating water
freezing. If this cannot be done, drain the system completely. In all
cases, consult the fitter.

Domestic hot water circuit:
Drain the domestic water tank and pipes.

Precautions to take in the event of prolonged shutdown (one year or more)

- Close the gas valve
- The boiler and the chimney must be swept carefully.
- Close the door of the boiler to prevent the internal circulation of air.

Advertising