Assembly, Start-up – Burkert Type BBS-3F User Manual

Page 3

Advertising
background image

5

6. ASSEMBLY

WARNING!

Danger – high pressure and discharge of medium!
• When working on the product or the system, always switch off the

pressure and relieve the lines.

• Wear protective equipment if media is hazardous.
Risk of injury from improper assembly!
• Installation must only be carried out by authorized technicians and

with the appropriate tools!

• Secure system from unintentional activation.

6.1. Welding in the inline inspection glass

NOTE!

Leak due to damaged sealing elements!

• Do not weld in the assembled product. It is essential to remove

the O-ring and glass tube before welding and to protect them from

dust, flying sparks and other influences!

Leak due to damaged sealing contour!

• To ensure the sealing function, protect the sealing contour during

installation, welding and cleaning procedures.

→

Connect the parts positively in a protective gas shield.

When cleaning the weld seam by grinding or acid cleaning, observe

the following before assembling the connection:
• Carefully remove all grinding dust and acid-cleaning residue.
• Do not damage the label.
• There must be no material abrasion on the sealing edges. Material

abrasion will result in sharp-edged sealing contours and a damaged seal.

• Check sealing contour for damage.

We recommend preparing a welding report.

english

6

6.2. Assembling orbital inline inspection glass

7

7

6

6

5

5

4

4

2

1

2

3

Fig. 2:

Assembling orbital inline inspection glass (with union nut)

→

Insert both O-rings (2) by hand (do not use any tools or sharp

implements) into the two designated grooves in the inspection

glass holder (1).

→

Carefully push glass (3) into the inspection glass holder. Ensure

that the O-rings are in the correct position.

→

Attach an O-ring (4) and a liner (5) to each side (do not use any

tools or sharp implements) and secure with the union nuts (6).

→

Tighten union nuts and secure with retaining rings (7).

6.3. Assembling standard inline inspection glass

5

4

2

1

2

3

4

5

Fig. 3:

Assembling standard inline inspection glass

→

Insert both O-rings (2) by hand (do not use any tools or sharp

implements) into the two designated grooves in the inspection

glass holder (1).

→

Carefully push glass (3) into the inspection glass holder. Ensure

that the O-rings are in the correct position.

→

Attach an O-ring (4) and a connecting piece (5) to each side (do

not use any tools or sharp implements).

→

Tighten connecting pieces.

english

7

6.4. Assembling full view inline inspection glass

6

6

5

5

1

1

3

3

4

2

7

4

Fig. 4:

Assembling full view inline inspection glass

→

In each flange (1) insert two O-rings (3 +4) by hand (do not use

any tools or sharp implements).

→

Push glass (7) into one of the two flanges. Ensure that the O-rings

are in the correct position.

→

Also insert spacer bolts (2) into the designated bores, secure with

washers (5) and nuts (6).

→

Attach second flange, secure with washers and nuts.

→

Tighten nuts.

6.5. Disassembly

Disassembly is in reverse sequence to assembly.

7. START-UP

WARNING!

Risk of injury from improper operation!

Improper operation may result in injuries as well as damage to the

product and the surrounding area.
• Before start-up, ensure that the operating personnel are familiar

with and completely understand the contents of the operating

instructions.

• Observe the safety instructions and intended use.

• Only adequately trained personnel may start up the equipment/the

product.

• Following assembly, ensure a controlled restart.

• When starting up the equipment, ensure that no unauthorized volt-

age increases and pressure surges can occur.

english

Type BBS-3F

Advertising