I n s ta l l at i o n – Alto-Shaam AR-7E User Manual

Page 8

Advertising
background image

S TA C K I N G I N S T R U C T I O N S

A rotisserie can be stacked with another rotisserie or can

be stacked on top of a matching holding cabinet.

Stacking hardware is required for all stacking combinations

(

SEE ABOVE AND THE OPTIONS LIST ON PG

8

FOR MORE INFORMATION

).

All fastening holes have been prepunched. The stacking

combination also requires the minimum clearance of

6" (152mm) at the top, back and both sides.

NOTE:

Do note remove corner panels. They are not

shown in the drawing only to increase visibility of

the interior components.

1. Remove the access panels of both units.
2.

208-240V, 1PH - RH/LH DOOR SWING

:

Remove power cord, strain relief bushing, and

strain relief washer (drill out 2 rivets) from the

rotisserie intended to be on the top. Discard

power cord.

208-240V, 3PH - RH/LH DOOR SWING:

Remove power cord and strain relief bushing from

the rotisserie intended to be on the top. Discard

power cord.

380-415V - RH/LH DOOR SWING:

Remove strain relief bushing from the rotisserie

intended to be on the top.

3. Attach cover plate (1010464) to cord hole with 2 rivets.
4. Remove any existing legs or casters from both of

the rotisseries.

5. Review “stacking combinations & installation

requirements” above, then attach support brackets

and legs or casters to the rotisseries intended to be

on the bottom with 1" (25mm) screws, washers, and

lock washers.

6. Punch out the knock out holes A, B, C, & D.
7. Detach decorative exhaust by removing 6 screws from

top panel of rotisserie intended to be on the bottom.

8. Remove 4 plugs (E) from top panel of rotisserie

intended to be on the bottom.

9. Apply high temp silicone around perimeter of

exhaust opening on the top panel of the rotisserie to

be on bottom (F).

10. Carefully lift and place the upper unit into position

aligning on the bottom unit.

11. Secure units together by inserting a hex head screw

and a flat washer in each hold of the top unit and a

flat washer, lock washer, and hex nut inside the

bottom unit. Securely tighten all four screws.

S TA C K I N G C O M B I N AT I O N S & I N S TA L L AT I O N R E Q U I R E M E N T S

S TA C K I N G C O M B I N AT I O N S

(

FACTORY INSTALLED

)

AR-7E rotisserie over AR-7E rotisserie

Requires 6" (152mm) leg assembly 5001414 or 5" (127mm) casters 4007 and stacking assembly (5009981,

5009982, 5009983, 5010355, 5010356, or 5010357 - depending on voltage and door swing - see pg 8) for

applications within the United States. Applications outside the U.S. requires 6" (152mm) legs with

flanged feet 5001761 bolted to the floor.
[

OVERALL HEIGHT

: 76-7/8" (1953mm)]

AR-7E rotisserie over AR-7H companion holding cabinet

Requires 6" (152mm) leg assembly 5001414 or 5" (127mm) casters 4007 and stacking assembly (5008787,

5008948 or 5008922 - depending on voltage - see pg 8) for applications within the United States.

Applications outside the U.S. requires 6" (152mm) legs with flanged feet 5001761 bolted to the floor.
[

OVERALL HEIGHT

: 76-7/8" (1953mm)]

C A U T I O N

STACKING APPLICATIONS
OUTSIDE THE U.S. REQUIRE
FLANGED FEET AND MUST
BE BOLTED TO THE FLOOR.

C A U T I O N

MAKE CERTAIN TO FASTEN

EACH OF THE FOUR HOLES

I N S TA L L AT I O N

A R - 7 E R o t i s s e r i e O p e r a t i o n & C a r e M a n u a l • 6

Advertising