Operating manual – Hydra-Flex Aqua-Lab MD Operating Manual User Manual

Page 7

Advertising
background image

Operating Manual

© Hydra-Flex Inc 2011

- 7 -

Triple Foam Setup (for MD5 if ordered with extra regulators)


If your MD5 panel was ordered with 3 air valves and 5 air regulators or with 5 air valves and 7 air regulators the
below instructions will show you how to setup your triple foam.

3 Valve / 5 Regulator MD5 Panel

•

Your triple foam has been setup from the factory to be in port 3

•

Insert your triple foam manifold into position 3 with your selected injectors already inserted

•

On the side of the panel the 3

rd

, 4

th

, and 5

th

regulators (numbering starts at the top) will control the air to each of

your triple foam colors

•

Insert your air lines to the arch into the bulkhead fittings on the bottom of the panel. The 3

rd

, 4

th

, and 5

th

bulkhead

(counting from left to right) will be the airlines for each color.









5 Valve / 7 Regulator MD5 Panel

•

Your triple foam has been setup from the factory to be in

port 5

•

Insert your triple foam manifold into position 5 with your selected injectors
already inserted

•

On the side of the panel the 5

th

, 6

th

, and 7

th

regulators (numbering starts at the

top) will control the air to each of your triple foam colors

•

Insert your air lines to the arch into the bulkhead fittings on the bottom of the
panel. The 5

th

, 6

th

, and 7

th

bulkhead fittings (counting from left to right) will be

the airlines for each color.








Note: Occasionally if all three regulators are pre-set too high, you may need to lower all three regulators to their
lowest setting and then turn them up to the desired pressure.








Advertising