5installation, 3 cable list and minimum thickness, 2 tools and materials – CAME Axo-S524 Kit User Manual

Page 6: 1 preliminary checks

Advertising
background image

Pa

g

.

44

- M

an

u

al

c

od

e:

1

1

9

D

U

8

5

11

9

D

U

8

5

ver

.

0

.1

0.

1

0

1

/2

0

0

9 © C

A

M

E c

an

ce

lli a

u

to

m

at

ic

i s

.p.

a.

- T

h

e d

at

a a

n

d i

n

fo

rm

at

io

n r

ep

or

te

d i

n t

h

is

in

st

al

la

ti

on

m

an

u

al

a

re s

u

sc

ep

ti

b

le t

o c

h

an

g

e a

t a

n

y t

im

e a

n

d w

it

h

ou

t o

b

lig

at

io

n o

n C

A

M

E c

an

ce

lli a

u

to

m

at

ic

i s

.p.

a.

t

o n

ot

if

y u

se

rs

.

ENGLISH

Make sure you have all the tools and materials you will need for the installation at hand to work in total safety and compliance with the
current standards and regulations. The following figure illustrates the minimum equipment needed by the installer.

N.B.: If the cable length differs from that specified in the table, then you must determine the proper cable diameter in the basis of the
actual power draw by the connected devices and depending on the standards specified in CEI EN 60204-1.
For connections that require several, sequential loads, the sizes given on the table must be re-evaluated based on actual power draw
and distances.
When connecting products that are not specified in this manual, please follow the documentation provided with said products.

5.3 Cable list and minimum thickness

Connections

Type of cable

Type of cable

Length of cable

10 < 20 m

Length of cable

20 < 30 m

Control panel power supply 230V

FROR CEI

20-22

CEI EN

50267-2-1

3G x 1,5 mm

2

3G x 2,5 mm

2

3G x 4 mm

2

Motor power supply 230V

4G x 1 mm

2

4G x 1,5 mm

2

4G x 2,5 mm

2

Flashing light

2 x 0,5 mm

2

2 x 1 mm

2

2 x 1,5 mm

2

Photocell transmitters

2 x 0,5 mm

2

2 x 0.5 mm

2

2 x 0,5 mm

2

Photocell receivers

4 x 0,5 mm

2

4 x 0,5 mm

2

4 x 0,5 mm

2

Accessories power supply

2 x 0,5 mm

2

2 x 0,5 mm

2

2 x 1 mm

2

Control and safety devices

2 x 0,5 mm

2

2 x 0,5 mm

2

2 x 0,5 mm

2

Encoder connection

TWISTATO

3 x 05 mm

2

Antenna

RG58

max. 10 m

5.2 Tools and materials

5

Installation

Before installing, do the following:

• Make sure you have suitable tubing and conduits for the electrical cables to pass through and be protected against mechanical

damage;

• Fit tubing to drain away any water leaks which may cause oxidation;

Make sure that any connections inside the case (that provide continuance to the protective circuit) be fitted with extra insulation

as compared to the other conductive parts inside;

• Make sure the structure of the gate is sturdy, the hinges work and that the is no friction between moving and non-moving parts;

• Make sure there is a mechanical stop for opening and closing.

Installation must be carried out by expert qualified personnel and in full compliance with current regulations.

5.1 Preliminary checks

Advertising