Installation instructions, Cleaning set lzy367, Introduction – Hach-Lange LZY367 cleaning set for filtration probe sc User Manual

Page 3

Advertising
background image

1

DOC273.52.00146Jun06

Installation instructions

Cleaning set LZY367

Introduction

These installation instructions describe the installation and use of the cleaning set LZY367.

Items supplied, cleaning set LZY367

Selecting the installation location

Note: Ensure you have the operating instructions
for the analysis instrument DOC023.XX.00025.YYYyy or DOC023.XX.00026.YYYyy
(xx= language, YYYyy= date) and
the FILTRATION PROBE sc DOC023.XX.00024.YYYyy
(xx= language, YYYyy= date) at hand.

Note: When selecting the installation location, ensure the tray used and the FILTRATION PROBE sc are
securely mounted and chemicals cannot leak.

During the selection of the installation location, pay attention to

Ease of access to the enclosure door for the analysis instrument,

The maximum cable and tubing lengths and

Ease of access to the display module.

Figure 1 Items supplied, cleaning unit LZY367

1

O-ring (7.5 x 2.5 NBR), 2 pieces

5

PharMed tubing

2

Cleaning adapter for FILTRATION PROBE sc, 2 pieces

6

Tubing (2 m long, 3.2 x 0.8), LZY195

3

Tubing (4 x 1, 0.7 m), 2 pieces

7

Set of fittings (3.2 mm) LZY111
Tapered insert and union nut (2 pieces each)

4

Disposable syringe (20 mL)

8

Blind plug, 2 pieces, LZY193

Advertising