1 mechanical installation, 1 required tools – Hach-Lange BUHLER 3010 4010 6010 Short Manual User Manual
Page 12
Advertising
12
Installation
3.1 Mechanical installation
DANGER
Select an appropriate installation location for the instrument.
Plan out the mechanical mount·before positioning poles or drilling holes. Make
sure the mount has a sufficient bearing capacity. The dowels must be selected and
authorized according to the condition of the wall.
The manufacturer shall accept no liability if the instrument is installed incorrectly.
Plan how to lay cables and tubes and their path in advance. Lay the tubes, data
cables and power cables without any bends and so they do not pose a tripping
risk.
Note: For information on installation with optional accessories, refer to the relevant installation
instructions.
3.1.1 Required tools
Figure 4 Required tools
17 mm
Advertising