Concrete pad for sw-350dc – Controlled Products Systems Group AOMSW350DC User Manual

Page 7

Advertising
background image

24”

30”

25 ”

9”

15”

1

1

/

2

/

2

1

/

2

24”

4”

21

14

1

4

17 / ”

Operator plastic
cover

Operator frame

1

/

2

1

/

2

Four red head

Bolts ”

X 3

Area for Conduit(s)

Operator concrete pad

When possible
install 4” above
ground

Footing for
gate operator

Low voltage single
conduit for Master/Slave

High voltage
conduit

CONCRETE PAD FOR

SW-350DC

6

Advertising