Warning, Operator setup, Controller access – Controlled Products Systems Group GSLG-A-111 User Manual

Page 7: Manual disconnect, Ac power connection, Earth ground

Advertising
background image

GSLG-A Slide Gate Operator Installation Guide

- 5 -

P1222 Revision X5 6-22-2011

Operator Setup

Controller Access

The Controller is protected by a plastic dust cover (single
phase models only). To remove the dust cover, loosen the
cover’s wing-screw and lift the cover off (see Figure 5).

Manual Disconnect

The manual disconnect shifter lever and the locking lever is
illustrated in Figure 8. They can be found at the center and
to the left inside the operator cabinet. (The handle of each
has been fi nished in easy to spot red fi rm-grip coating.)

To disconnect the unit for manual operation, grasp the
handle of the spring-loaded shifter lever and pull it directly
toward you until the spring-loaded locking lever snaps into
place behind it. This action disengages the pinned shifter
block from the drive mechanism and holds the block in the
disengaged position.

To re-engage the operator, move the locking lever to the
right, releasing the spring-loaded shifter lever to snap back
into the engaged position.

AC Power Connection

All Linear gate operators are supplied with a power
disconnect switch to turn on and off the power available to
the operator (see Figure 6). Following wiring specifi cations
on Page 2, incoming power should be brought into the
operator and connected to the labeled pigtails from the
disconnect box. A wiring connections print can also be
found on the label inside the cover of the operator.

Proper thermal protection is supplied with the operator. The
motor contains a thermal overload protector to guard from
overheating the motor due to overload or high-frequency
operation. This overload protector will reset automatically
after the motor cools down.

Earth Ground

Install a ground rod and connect it to the operator’s frame
in every gate operator installation. A good earth ground
is necessary to allow the Controller’s built-in surge and
lightning protection circuitry to work effectively. The physical
bolting of the operator to the mounting pad is not suffi cient
for a good earth ground.

NOTE: Do not splice the ground wire. Use a single piece of solid

copper 12 AWG wire between the ground rod and the operator.

1. Install an 8-foot long copper ground rod next to the operator mounting

pad within three feet of the operator.

2. Use a clamp to connect a solid copper 12 AWG ground wire to the

ground rod.

3. Route the ground wire to the operator.

4. Connect the ground wire to the operator’s frame.

Figure 7. Power Disconnect Box Wiring

110 VOLT

OPERATOR

POWER

DISCONNECT

BOX

BLACK

220 VOLT

OPERATOR

POWER

DISCONNECT

BOX

WHITE

GREEN

BLACK

WHITE

GREEN

HOT

NEUTRAL

GROUND

HOT

HOT

GROUND

Figure 5. Controller Access

LOOSEN KNOB
TO REMOVE
CONTROLLER
COVER

WARNING

ALL AC ELECTRICAL CONNECTIONS TO THE POWER SOURCE AND
THE OPERATOR MUST BE MADE BY A LICENSED ELECTRICIAN AND
MUST OBSERVE ALL NATIONAL AND LOCAL ELECTRICAL CODES

Figure 6. Manual Disconnect Lever

MANUAL DISCONNECT

SHIFTER LEVER

PULL TO DISENGAGE

LOCKING LEVER

PUSH TO RIGHT TO

RE-ENGAGE OPERATOR

TO MANUALLY MOVE THE GATE,
PULL SHIFTER LEVER TO
DISENGAGE THE DRIVE TRAIN

GATE LIMIT SETTINGS WILL
NOT BE AFFECTED WHEN
GATE IS MANUALLY MOVED

PULL

PUSH

Advertising
This manual is related to the following products: