Installation – Controlled Products Systems Group CSW24V User Manual

Page 18

Advertising
background image

16

INSTALLATION

INSTALLATION CONTINUED...

INSTALLATION CONTINUED...

WELD THE OPERATOR ARM

Once the operator arm measurements are verified:

1

Weld the gate bracket to the gate.

2

Weld the short arm section.

3

Weld the long arm section.

4

Remove the set screws from the arm.

NOTE: Completely weld around the outer tubing and bracket.

3

1

2

SECURE THE OPERATOR ARM TO THE OUTPUT SHAFT

1

Adjust the nuts on the operator arm so the operator arm fits snug on the

output shaft yet still allows enough room to swivel (the handle must be in a

90° position).

2

Tighten the handle by pushing it down. Test to make sure the operator arm

does not slip on the output shaft.

1

2

REMOVE THE PINS FROM THE VENT PLUGS

1

Remove the pin from the vent plug on both the top and bottom gear boxes.

Pin

Top Gear Box

Bottom Gear Box

Vent Plug

Advertising