Installation – Controlled Products Systems Group CSW24V User Manual
Page 18

16
INSTALLATION
INSTALLATION CONTINUED...
INSTALLATION CONTINUED...
WELD THE OPERATOR ARM
Once the operator arm measurements are verified:
1
Weld the gate bracket to the gate.
2
Weld the short arm section.
3
Weld the long arm section.
4
Remove the set screws from the arm.
NOTE: Completely weld around the outer tubing and bracket.
3
1
2
SECURE THE OPERATOR ARM TO THE OUTPUT SHAFT
1
Adjust the nuts on the operator arm so the operator arm fits snug on the
output shaft yet still allows enough room to swivel (the handle must be in a
90° position).
2
Tighten the handle by pushing it down. Test to make sure the operator arm
does not slip on the output shaft.
1
2
REMOVE THE PINS FROM THE VENT PLUGS
1
Remove the pin from the vent plug on both the top and bottom gear boxes.
Pin
Top Gear Box
Bottom Gear Box
Vent Plug