Operator installation – Controlled Products Systems Group OH200DC User Manual

Page 6

Advertising
background image

5

OPERATOR INSTALLATION

+

+

With gate closed, mark the center of the gate.

Lift gate to open position and mark the center point of the gate for the operator on the ceiling.

Note:

Make sure the gate hardware is well balanced and the gate opens and closes smoothly.

Advertising