Ha2401-g11fnfpcx_11 – L-com HA2401-G11FNFPCX User Manual

Page 11

Advertising
background image

Running the Link Test Utility

You should now be ready to align the antenna using the Link Test utility. During the
Link Test, the Access Point and a selected Test Partner device exchange a series of
packets to test the strength and quality of the wireless connection. The Link Test utility
tab is accessible from the Monitor option.

Advanced Network Settings

The sytem should now be ready for advanced network configuration parameters. For
more information about the Advanced Network Settings, refer to the AP-2000 User
Guide.

Copyright © This drawing is property of L-com Global Connectivity. All rights reserved.

L-COM, INC. 45 BEECHWOOD DRIVE NORTH ANDOVER, MA 01845

WWW.L-COM.COM E-MAIL: [email protected] PHONE: 1-800-343-1455 FAX: 1-978-689-9484

© L-com, Inc. All Rights Reserved. L-com Global Connectivity and the L-com logo are registered marks.

Advertising