Ip-00017_2 – L-com HG2419G User Manual

Page 2

Advertising
background image

IP-00017 Rev. C – 05/05 Page 2 of 3

HG2415G and HG2419G Installation Instructions

Determine the polarity which will be chosen
for the antenna installation. The antenna can
be installed either vertically or horizontally
polarized.

The two polarities are illustrated below:

Horizontal

Polarity

Vertical
Polarity

Position the “L” Bracket to the back of the Grid Assembly,
noting the orientation required for the desired polarity.

Position the Feedhorn to the front of the Grid Assembly,
again noting the orientation required for the desired polarity.

Secure the Feedhorn & “L” Bracket to the Grid Assembly
using (4) #M6 machine screws with lock washers, flat
washers and nuts.

Feedhorn

Grid Assembly

“L” Bracket

Install the (2) Mast Clamps on the U-Bolts as shown
and fasten to the “L” Bracket using (4) lock washers
and (4) Nuts.

To mount antenna assembly in a tilted position,
attach (1) U-Bolt assembly to either the fixed tilt
positions or to the tilt slot (as shown) on the
“L” Bracket.

U-Bolts

Mast Clamps

“L” Bracket

Mast

Tilt Slot

Fixed Tilt Positions

OPTIONAL TILTED MOUNTING

Important Note: Feed Reflector must be orientated to
grid as shown for optimal antenna performance.

Feed Reflector

Copyright © This drawing is property of L-com Global Connectivity. All rights reserved.

L-COM, INC. 45 BEECHWOOD DRIVE NORTH ANDOVER, MA 01845

WWW.L-COM.COM E-MAIL: [email protected] PHONE: 1-800-343-1455 FAX: 1-978-689-9484

© L-com, Inc. All Rights Reserved. L-com Global Connectivity and the L-com logo are registered marks.

Advertising
This manual is related to the following products: