Side panels, Receiver installation, Receiver removal – Lectrosonics Quadpack User Manual

Page 4: Pin-out/polarity diagram, Installing receivers to quadpack, Removing receivers from quadpack

Advertising
background image

QUADPACK

LECTROSONICS, INC.

4

Receiver Installation

Installing Receivers To Quadpack

First install the SRUNI rear panel adapter.

The mating 25-pin connector inside each slot on the

Quadpack provides power and audio connections.

Install the SR receiver into the Quadpack by aligning

it with the internal guide and DB25 connector, and

sliding it in until it seats firmly. The front panel flange

should sit flush with the top panel of the Quadpack.

Receiver Removal

Removing Receivers From Quadpack

Remove receivers from the Quadpack by first loosen-

ing the 4 mounting screws, inserting the Delrin tool into

the notch and prying upward to release the receiver

from the DB25 connector.

Pin-out/Polarity Diagram

7 to 18 VDC

400 mA max.

(+)

(–)

4

3

2

1

(+)

Pin 4

(–)

Pin 1

4

3

2

1

1
2
3

1
2
3

3
2
1

3
2
1

1
3
2

1
3
2

1
3
2

1
3
2

- Ground
- Audio (+)
- Audio (-)

Advertising