Priming solvent – Magnum Venus Plastech PUTTY UNIT User Manual
Page 18

Putty Unit Operations Manual
Rev. 07/2012
Page | 18
Priming Solvent:
1. Close the main inlet air valves on the main air manifolds (see Fig. 12)
Fig. 12
2. Connect 1/2 inch main air supply to the Air Manifold (see Fig. 12)
3. Turn all regulators counterclockwise to full off and close all ball valves on the pump supply.
4. Make sure Ram control levers are in “neutral” position (see Fig. 13)
Fig. 13
5. Open Main Air Supply Ball Valve and listen for air leaks. The ball valve has a safety relief port and
air will leak from the port until the valve is fully open or closed.
6. Secure all fittings and correct leaks if found
7. Fill Flush Tank with appropriate cleaning agent or place solvent pump onto an approved container
full of the cleaning agent.
8. Close the relief valve on the top of the Flush Tank.
Connect the air supply to the
supplied fitting 1/2"nps.