Metering pump assembly, Assemble outlet check valve assembly, Assemble outlet body – Magnum Venus Plastech Pro Series PCP-2000 User Manual

Page 22

Advertising
background image

PCP-2000 Catalyst Pump Manual

Rev. 05/2012

Page | 22

PISTON SEAL

SEAL RETAINER

LOWER GUIDE

PISTON BODY

Metering Pump Assembly:

Assemble Outlet Check Valve Assembly

Not all systems will have this outlet check valve assembly installed;

some systems will have the outlet fitting or the relief valve adapter.

DANGER: Fire and Explosion hazard. Use only clean water to wet the S.S. ball. Fire or

explosion may occur if the catalyst system is contaminated.

WARNING: Follow all materials handling and storage suggestions from your catalyst

manufacturer.

1. Wet the S.S. ball (9201-1-7) and the ball seat with clean water, and gently roll the ball

into the check valve body (4101-15-1).

2. Insert the spring (4101-16-1) on top of the S.S. ball in the check valve body.
3. Screw the retainer into the check valve.
4. Be sure the jam nut (4101-18-1) is screwed onto the check valve.

Assemble Outlet Body

WARNING: Follow all materials handling and storage suggestions from your catalyst

manufacturer.

1. On the piston body (4101-4-1), install the piston seal (7304-

2-1). Be sure the spring in the piston seal faces toward the

piston body (top of the pump).

2. Install the piston guide (4101-5-1) onto the piston body just

below the piston seal.

3. Screw the seal retainer (4101-6-1) onto the piston body.

NOTE: Bottom out the seal retainer on the threads, but not over-tighten. The seal should

still be able to move slightly.

4. Clean the piston seal with clean water.

5. Clean the S.S. ball (9201-1-5) and the ball seat with clean water, and gently roll the ball

into the piston body.

Advertising