6. Steam Damper Air Piston (Air Control) Operation Adjustment

Although the damper operation was tested and adjusted prior to shipping at 80 psi (5.51 bar), steam damper
operation must be checked before the dryer is put into operation. Refer to page 33 for instructions to
check steam damper system operation. If damper air adjustment is necessary, locate the flow-control valve
and make the necessary adjustments as noted below.

I. WATER INFORMATION

BEFORE YOU START!

CHECK LOCAL CODES AND PERMITS

Call your local water company or the proper municipal authority for information regarding local codes.

IMPORTANT: It is your responsibility to have ALL plumbing connections made by a qualified

professional to assure that the plumbing installation is adequate and conforms to local,
state, and federal regulations or codes.

IMPORTANT: It is the installer’s or owner’s responsibility to see that the necessary or required

water, water pressure, pipe size, or connections are provided. The manufacturer
assumes no responsibility if the fire suppression system is not connected, installed, or
maintained properly.

INSTALLATION

1. Requirements

The fire suppression system must be supplied with a minimum water pipe size of 1/2” and be provided with
40 psi +/- 20 psi (2.75 bar +/- 1.37 bar) of pressure. For use of optional manual bypass, a second source
with the same piping and pressure requirements is required.