Valley Installation - Nail one ValleyVent at the bottom of each valley rafter

pointing the 3-ply thick edge towards the valley jack rafter (the two adjoining

ValleyVents should be pointing as close as possible to the center of the valley jack

rafter). Applying the smooth side down, nail in place, install one vent per rafter in

all valley areas, and apply roof sheathing (plywood) over the ValleyVents and nail.

This application ensures air flow through the valley from the soffit to the ridge for

required air exchange. NOTE: Apply a shim spacer at the plywood cut edge in the

valley center if the plywood edge misses the vent strip (use 2.75” X 2.75” pieces of

3-ply ValleyVent or scrap plywood as this shim spacer). Ridge vents are required.

ValleyVent™

Installation Instructions

Skylight Installation - Nail one ValleyVent on each rafter above and below

the skylight rough openning pointing the 3-ply thick edge towards and even

with the skylight framing and the smooth side down. This application ensures

proper air flow around skylights for required air exchange. (NOTE: the sky-

light side vents run parrallel with the framing and are used simply as a shim

spacer, these side vents can be spaced 16” apart on longer runs). Install roof

sheathing (plywood) over ValleyVents and nail. Ridge vents are required.

Chimney Installation - Nail one ValleyVent on each rafter above and below the chimney

rough opening pointing the 3-ply thick edge towards and even with the chimney fram-

ing and the smooth side down. This application ensures air flow around the chimney for

required air exchange. (NOTE: the chimney side vents run parrallel with the framing and

are used simply as a shim spacer, these side vents can be spaced 16” apart on longer runs).

Install roof sheathing (plywood) over ValleyVents and nail. Ridge vents are required.

DCI Products Inc

www.dciproducts.com

800-622-4455

Hip Roof Installation - Nail one ValleyVent on each rafter at the top of the hip

rafter, one on each side of the hip beam, touching the pointed 3-ply thick edge at

the hip beam. Install ValleyVents on each rafter from the soffit area of the hip to the

ridge area of the hip (this ensures the proper required air flow from soffit to ridge

along the hip beam). Install roof sheathing (plywood) over ValleyVents and nail.

Ridge vents are required