Diamond Products FZ User Manual
Page 22

Procedure
1)
Mark the cutting line
2)
Mark the dowel line in sections of 22
cm (for flush cutting 24 cm)
3)
Mount the tracks (1) to the track ba-
ses (9).
Distance between track bases:
- as big as possible when using one
track only
- equally distributed along the whole
cutting distance when using more then
one track
Unscrew the adjusting screws (4) until
the track base is at least 2 cm above the
concrete, otherwise the swivel arm will
brush against the concrete.
4)
Fix the tracks to the concrete and
align them with a distance of 8 cm
(10 cm for flush cutting) to the cut-
ting line
5)
Align the tracks by means of the ad-
justing screw (8) so that all adju-
sting screws are in contact with the
concrete surface.
6)
Make sure that the tracks are in true
alignement and without distance at
the joints.
7)
Mount the track end stopper so that
the wall saw can’t fall off the track.
5.7
Mounting the wall saw head
$GMXVWLQJ JULS
*XLGLQJ GHYLFHV
+DQGOH
Fig. fz4-3a.tif
Fig. fz4-4.tif
Set-up
FZ
Page 22
FZ30494E