4set-up, Set-up sl – Diamond Products SL User Manual

Page 18

Advertising
background image

4

Set-up

4.0.1

Set-up for first operation

The system is supplied ready for use. The pro-
cedures described under ”Set-up” apply also to
the first operation run of a new machine.

4.1

Fastening of system

4.1.1

procedure

•

Drill Ø 100 mm for center tube (6)

•

Drill Ø 15 mm for rope at a distance of the
sawing radius (1/2D!)

Fasten center tube assembly (6) with two

hammer plugs M12 (5)

•

Insert central deflection reel (3) into top of
central tube unit (6)

•

and tie fast with bracket (7) (Central de-
flection reel at bottom analogous)

•

Insert upper extension arm (2) into the
receptacle and tighten up (lower extension
arm analogous)

Fig.mont4.tif

Fig.mont5.tif

Fig. mont3.tif

Set-up

SL

page 18

sl9806e

Advertising