Installation procedures – Andrew 9.3-Meter ESA User Manual

Page 10

Advertising
background image

Overview

Foundation

Preparation

10

Installation Procedures

This section provides installation procedures for the 9.3-Meter Andrew Earth Station
Antenna. The installation procedures include instructions on the following antenna com-
ponents:

•

Mount

•

Reflector-to-Mount Assembly

•

Reflector

•

Subreflector

•

Enclosure

•

Feed System (C-band)

Before beginning the installation process on the ground mount assembly, ensure that
the foundation has been prepared. Foundation specifications are provided by Andrew
and may be used as a reference by civil engineering personnel when preparing the
foundation for local soil conditions. These specifications are available before the ship-
ment arrives by contacting the Customer Service Center or your Account Manager.

•

Foundation should be dimensioned as detailed in Figure 1.

•

Sweep foundation clear of any dirt or debris.

•

To ensure smooth surface for mount, scrape foundation pads as shown in Figure 2.

•

Studs should extend 3 in. above the ground and are 7/8 in. in diameter

•

Apply stick wax to stud threads to ease later connections.

Installation Procedures

Figure 1

Figure 2

Advertising