Installation – Poweramp CENTRAPOWER User Manual

Page 13

Advertising
background image

11

4111-0030 — Nov.2009

INSTALLATION

Centra Power main control panel should be located
near the Central Power pump station.

The pump control panel has 2 lights located on the

door. There is 3 position switch mounted in side
the door. The switch on the system controls one or
both motors when a leveler has been activated. The
lights on the control indicate if one or both motor
starters have tripped.

If only one pump is being used, rotate motors every

6 months. This will make sure both motors are fresh
and working.

Advertising