Installation – Fulton Electric (FB-L) Steam Boiler User Manual

Page 15

Advertising
background image

Electric IOM

Installation

11

5

6

4

7

19

300 to 1000 kW (30 to 100 BHP)

Elements are vertically mounted. There
boilers have an externally mounted water
bottle assembly housing the low water cut-
off probe, pump on and pump off probe.
The second (auxiliary) low water cut-off
probe is mounted in the top of the boiler.

Component Locations of the Fulton 12 to 1000 kW
(1.2 to 100BHP) Steam Boilers

Advertising