Safety warnings and precautions – Fulton Ancillary Equipment Horizontal and Vertical Return Systems User Manual

Page 6

Advertising
background image

4

RTN IOM

Safety Warnings and Precautions

This manual is provided as a guide to the correct operation and
maintenance of your Fulton Condensate Return System and should
be permanently available to the staff responsible for the operation
of the return system.

These instructions must not be considered as a complete code of
practice, nor should they replace existing codes or standards which
may be applicable.

NOTE

The installation of the Fulton Condensate Return System
should be carried out by competent personnel in accordance
with all relevant safety regulations.

Prior to shipment the following tests are made to assure the
customer the highest standards of manufacturing:

a) Material inspections.
b)

Manufacturing process inspections.

c)

ASME welding inspections.

d)

ASME hydrostatic test inspection.

e)

Electrical components inspection.

f)

Operating test.

g) Final Engineering Inspection
h)

Crating inspection.

All units are crated for fork lift transport. Once uncrated, all units can
be transported with a forklift.

Advertising