Teledyne 3300TA - Low cost trace oxygen analyzer User Manual

Page 23

Advertising
background image

3-7

Trace Oxygen Analyzer

Installation 3

Teledyne Analytical Instruments

Figure 3-5: Piping Diagram for Vacuum Service Option

3.5

Installation Checklist

Before connecting the instrument to the power source and turning it on,

make sure you have:

•

Correctly installed the Sample and Exhaust gas lines

•

Checked for leaks

•

Set the sample pressure to 5–10 psig (34.5 - 68.9 kpa), nominal
(for non-vacuum service units)

•

Set the flow

Once the above checks have been made, you can connect to the power

source. The instrument is now ready for operation.

Customer Supplied Parts

Advertising