Electronics International MVP-50P User Manual

Page 41

Advertising
background image

6.0

6.0

6.0

6.0

6.0

System Configuration Screens

System Configuration Screens

System Configuration Screens

System Configuration Screens

System Configuration Screens

6.1 Password Protection:

6.1.1 Level #1 Password (Maintenance):
6.1.2 Level #2 Password (OEM):

6.2 System Configuration Screens Overview:

6.3 “USB Flight Data File Manager” Screen:

6.4 “USB Config and Software Program Manager” Screen:

6.5 “Change Password” Screen:

6.6 “Aircraft ID, Gear Warning and TAS Setup” Screen:

6.7 “Engine Data, Hour Meters and Flight Timers Setup” Screen:

6.8 “Serial Port Setup” Screen:

6.9 “EGT/CHT Bar Graph Limits and Color Setup” Screen:

6.10 “Weight & Balance Setup” Screen:

6.11 “Fuel Tank Calibration” Screen:

6.12 “Horsepower Calibration” Screen:

6.13 “Pressure Altitude Calibration” Screen:

6.14 “Flaps, Trim and Special Function Calibration” Screen:

6.15 “MVP Input/Output Tests” Screen:

6.16 “EDC Inputs, Functions and Screen Setup” Section:

6.17 “1. EDC Input to Function Mapping” Screen:

6.18 “2. Function to Main Screen Mapping” Screen:

6.19 “3. Function to System Screen Mapping” Screen:

6.20 “4. Redlines, Limits and Color Setup” Screen:

6.21 “5. EDC Input Calibration” Screen:

41

Advertising