4. Verify operation of manual start.

P Press the START button on the ISA Main Unit and verify that all tools run in the

correct direction until the pre-programmed time elapses, creating a TIME reject. The
ISA Main Unit "REJECT" light will illuminate, and the "TIME" LED on each Axis Unit
will light (orange).

P Press the RESET button on the ISA Main Unit to clear the REJECT and TIME

outputs.

NOTE3: If any Axis Unit fails to indicate a TIME reject (and assuming the previous verifications were

completed), then check the presets that have been entered into the System for that spindle.
Reference Section 7.2 Limit Parameter for guidance.

5. Verify System operation by external commands.

P Confirm that the equipment operates correctly when PLC inputs and outputs are

activated. Use the PLC to perform all of the functions (START, CAL, etc.) that were
manually activated earlier in this Section.