FEC DSP1500 (SAN3) User Manual

Page 3

Advertising
background image

enFORCE

Operation Manual

PAGE 5 - 3

Chapter 5: Powering Up and Initial Checks

Check the Input Voltages (2.1, 4.4)

Verify that the Input Power Connector is properly wired and that the voltage to be applied is
within the specified range.
Verify that the 24VDC and 0VDC common wires are properly connected. Damage may occur if
wired improperly.

Be sure to check the previously mentioned items before turning the power on.

Power Voltage Re-Checks

Re-check the input power voltage after turning the power on to make sure the voltage does not
drop due to loading.
Check again for loading when the Servo Press has started and the load is at its maximum level
for the press cycle (maximum power consumption time).

After powering the SAN unit down, the power must not be applied again for at least 5
seconds (1 minute recommended). Repeated power up and power down may
temporarily disable the SAN unit. If a SAN unit does become disabled, keep the power
off for at least five (5) minutes, then power on again to reset the fault.









































Advertising