Top view of scale detail "a, Bottom view of scale c1 c2 c3 c4 – Fairbanks Aegis Industrial Stainless User Manual
Page 20
Advertising

51103
20
01/07 -- Rev. 1
13.
15.
50604-7
LOCATE
THESE
LABELS
ON
BASE
FRAME
ASSY
TUBE
CORNER 2
CORNER 1
CORNER 4
CORNER 3
TOP VIEW OF SCALE
DETAIL "A"
INTERLOCK WIRE TIES TO
HOLD CABLES TO ANGLE
LOCATE ON
UNDERSIDE OF DECK
3.10
REF
SEE DETAIL "A"
BOTTOM VIEW OF SCALE
C1
C2
C3
C4
NOTES:
1. APPLY ANTI-SEIZE SEALING COMPOUND TO BOLT THE LOAD CELLS
TO THE MOUNTING BLOCKS. TORQUE TO 90 FT-LB.
2. PULL LOAD CELL CABLES SLIGHTLY TAUGHT AND USE WIRE TIES
(ITEM 16) TO ATTACH THEM TOGETHER AND KEEP CABLES CLOSE
TO BASE FRAME ANGLE.
3. SHIP ITEMS 14 AND 20 LOOSE WITH SCALE, LIFTING LABEL TO BE
APPLIED TO THE TOP OF THE PIT COPING FRAME BETWEEN HANDLES.
Parts Diagram - Stainless Steel Lift Deck 3’ x 3’ and 4’ x 4’ Models
Advertising
This manual is related to the following products: