Pre-installation checklist, Appendix iii – Fairbanks LabelBank Barcode Application For the FB3000 Series Operators Manuals User Manual

Page 13

Advertising
background image

Section 1: General Information

06/08

13

51170 Rev. 1

Pre-Installation Checklist

The following points should be thoroughly discussed between the
Fairbanks Representative and the Customer, before the Service
Technician installs any software or equipment.

9

Study the current Office Network and decide how the scale system
can best integrate into it.

Would a standalone unit be the best option?

Are the IP Addresses dynamic or set manually?

What are all the needed employee computer IP Addresses?

9

Decide the printer(s) arrangements within the Office, and list which users will link
to each one.

9

Determine the best physical placement for the scale(s) with its approaches and
exits, where the station(s) should be located, and also where the video cameras
should be put, if any are used.

9

Make a detailed list of the current employee hierarchy, and note how the
employee duties should determine their security level.

9

List the level(s) of training each employee needs over the LabelBank and the
DataBank Applications.

NOTE:

See

Appendix III

for the different detailed checklists.

Advertising