Connect posts to bottom shelf, Add shelf pegs & door hinges – Salamander Designs Synergy System 245C/B User Manual
Page 2
1
B
B
A
A
Leveler Foot
Hex Nut
Washer
90
O
B
.
Connect Post
Screw foot with metal washer through bottom
shelf and onto the end of each extruded post.
Place the 8.5” Post front and center of unit.
Hand tighten fully and use wrench to tighten
nut onto underside of shelf.
C
.
Post Cover
Press post cover onto 8.5” center
post to protect the center shelf.
A
.
Square Post
Square the post to the bottom shelf.
Connect Posts to Bottom Shelf
WARNING:
Tighten by screwing the leveler foot NOT the post.
2
Add Shelf Pegs & Door Hinges
!
!
B
.
Heavy Duty Bracket
The heavy duty brackets will be used
to supoort the double-width shelf.
C
.
Door Hinges & Shelf Pegs
1.
Slide the bottom hinge plate through the
front post channels. (Doors can be either left
or right side opening.)
2.
Insert one shelf peg into each post
except the center posts.
3.
Slide top hinge plate through front
post channels.
A
.
Group Shelf Pegs
There are two varieties of shelf pegs (A and B).
They are designed to cradle the shelf in place.
Refer to drawing.
A B
Doc No. 501-090/v10.12 245 -2 of 4