Connect posts to bottom shelf, Add shelf pegs & door hinges – Salamander Designs Synergy System 245C/B User Manual

Page 2

Advertising
background image

1

B

B

A

A

Leveler Foot

Hex Nut

Washer

90

O

B

.

Connect Post

Screw foot with metal washer through bottom
shelf and onto the end of each extruded post.
Place the 8.5” Post front and center of unit.
Hand tighten fully and use wrench to tighten
nut onto underside of shelf.

C

.

Post Cover

Press post cover onto 8.5” center

post to protect the center shelf.

A

.

Square Post

Square the post to the bottom shelf.

Connect Posts to Bottom Shelf

WARNING:

Tighten by screwing the leveler foot NOT the post.

2

Add Shelf Pegs & Door Hinges

!

!

B

.

Heavy Duty Bracket

The heavy duty brackets will be used

to supoort the double-width shelf.

C

.

Door Hinges & Shelf Pegs

1.

Slide the bottom hinge plate through the

front post channels. (Doors can be either left

or right side opening.)

2.

Insert one shelf peg into each post

except the center posts.

3.

Slide top hinge plate through front

post channels.

A

.

Group Shelf Pegs

There are two varieties of shelf pegs (A and B).
They are designed to cradle the shelf in place.
Refer to drawing.

A B

Doc No. 501-090/v10.12 245 -2 of 4

Advertising