Harwin Z80-280 User Manual

Insertion procedure, Insertion/extraction tool holder

Advertising
background image

IS-25 Issue: 4 Date: 19.06.12 C/Note: 11759

Page 1 of 3

DATAMATE ASSEMBLY TOOL Z80-280



Extraction Tool (Female contacts L-Tek and J-Tek)


Extraction Tool (Male contacts L-Tek only)


Extraction Tool (Male contacts J-Tek only)


Insertion Tool (for insulation up to Ø0.9mm)


Insertion Tool (for insulation from Ø0.9mm to Ø 1.1mm)


INSERTION PROCEDURE

1. Strip the wire and crimp the socket onto the wire, ensuring that the correct part is used (see

Instruction Sheet IS-01, Hand Crimp Tool M22520/01).

2. Ensure all parts (moulding and crimp sockets) are clean and ready for final assembly.
3. Select the appropriate insertion tool for the wire size in use and attach to the handle. The

different tools can be found by unscrewing the cap at the end of the handle (see above for
tool identification).

4. Place the crimped contact partially into the moulding. The correct position is reached when

approximately 1.5-2mm of socket protrudes (see Figures 2 and 3).

5. Place the insertion tool over the wire, with the wire sitting in the groove and the tool

resting on the back of the crimped socket (see Figure 1).

6. To complete the assembly, push firmly on the rear of the contact while ensuring the tool

remains perpendicular to the mould face. There will be an audible click when the socket is
correctly seated within the moulding.

Harwin North America

Harwin Europe

Harwin Asia

T: +1 603 893 5376 F: +1 603 893 5396

T: +44 (0) 23 9231 4545 F: +44 (0) 23 9231 4590

T: +65 6 779 4909 F: +65 6 779 3868

E: [email protected] W: www.harwin.com

E: [email protected] W: www.harwin.com

E: [email protected] W: www.harwinasia.com

Insertion/Extraction Tool Holder

Advertising