Hochiki FIRElink-25 User Manual

Page 23

Advertising
background image

FIRElink-25 – Installation Manual

Page 23 of 40

© 2010 Hochiki Europe (UK) Ltd

9-5-0-344/ISS4/OCT10

compliant. If functions are changed, it is recommended that the system is retested if continuing
compliance is in any doubt.

*The results should be verified at installation by entering the installed detector's Fire 1 sensitivity (as
indicated in the remote software histogram screen) into the PipeCAD “Options/Calculation
options/Detector sensitivity” field and recalculating the layout results.

Advertising