Joyce ACME SCREW Electric Cylinders (Standard, Motor mount, and ComDRIVE style) User Manual

Page 9

Advertising
background image

9


3-3 ACME Screw Electric Cylinder Parts Numbers (continued)

Model

Number

ECAL810

ECAL2410

ECAM810

ECAM2410

ECAH810

ECAH2410

ECAL820

ECAL2420

ECAM820

ECAM2420

ECAH820

ECAH2420

Static

Capacity

10 TON

10 TON

10 TON

20 TON

20 TON

20 TON

Lifting
Screw

Diameter

(inches)

2

2

2

2 1/2

2 1/2

2 1/2

Thread

Pitch/ Lead

(inches)

.25

.50

.33 / .66

.25

.50

.375/.75

Worm Gear

Ratio

8:1

24:1

8:1

24:1

8:1

24:1

8:1

24:1

8:1

24:1

8:1

24:1

Worm Shaft
Turns for 1"

Travel

32
96

16
48

12
36

32
96

16
48

10.67

32

Tare Torque

(inch/Lbs.)

30
25

30
25

30
25

60
40

60
40

60
40

Starting

Torque

(Inch/lbs.)

.052W*
.026W*

.061W*
.031W*

.070W*
.035W*

.066W*

.035W *

.075W*
.039W*

.088W*
.046W*

Operating

Torque †

(inch lbs.) @

Worm RPM

.036W*
.016W*

@ 200 RPM

.044W*
.019W*

@ 200 RPM

.051W*
.022W*

@ 200 RPM

.044W*
.019W*

@ 200 RPM

.052W*
.022W*

@ 200 RPM

.062W*
.027W*

@ 200 RPM

Translating

Tube Torque

* (inch lbs.)

.162W

.195W*

.228W*

.194W*

.227W*

.273W*

Base Weight

( lbs)

64

64

64

124

124

124

Add to Basic

Jack Weight

(lbs.) for

each

Additional 1"

of Travel

2.8

2.6

2.7

4.9

4.7

4.8

Max. Vertical

Rise

84”

60”

76”

100”

78”

88”

Max.

Horizontal

Rise

63”

45”

57”

75”

58”

66”

W*= Load in pounds
Tare Torque: The initial torque needed to overcome seal and normal assembly drag. This value must be added to starting torque
or operating torque values.
Starting Torque: Torque value required to start moving a given load (dissipates to operating torque value once the load begins
moving).
Operating Torque: Torque required to continuously raise a given load at the input RPM listed.
Translating Tube Torque: Torque required to resist the tube rotation.

Advertising