CyberChiller Series Installation, Operation & Maintenance Manual

APPENDIX A - FORMS

Stulz Air Technology Systems Inc.

Frederick, Maryland USA 21704

Telephone: (301) 620-2033 Facsimile: (301) 620-1396

Checklist for Completed Installation

Frederick, Maryland USA 21704

CyberChiller Series

Telephone: (301) 620-2033

Facsimile: (301) 620-1396

❏

1

Proper clearances for service access have
been maintained around equipment.

❏

2

Equipment is level and mounting fasteners (if
applicable) are tight.

❏

3

Piping completed to refrigerant or coolant loop
(if required).

❏

4

All field installed piping leak tested.

❏

5

Refrigerant charge added (if required).

❏

6

Incoming line voltage matches equipment
nominal nameplated rating ± tolerances.

❏

7

Main power wiring connections to the

equipment, including earth ground, have been
properly installed.

❏

8

Customer supplied main power circuit breaker

(HACR type) or fuses have proper ratings for
equipment installed.

❏

9

All wiring connections are tight.

❏

10

Control wiring connections completed to

evaporator and condenser/condensing unit
(if required), including wiring to wall mounted
control panel and optional controls.

❏

11

Foreign materials have been removed from

inside and around all equipment installed
(shipping materials, construction materials,
tools, etc.).

❏

12

Compressors and pumps rotate freely without

unusual noise.

❏

13

Inspect all piping connections for leaks during

initial operation.