SRM-121/SRM-150 LCD Monitor

Page 55

5.3 Pre-installation Preparation

5.3.1 Tools

Before installing the SRM series industrial monitor, make sure the following tools are on

hand:

Phillips (crosshead) screwdriver: All the retention screws on the system are

Phillips screws.

Soft working mat: When the SRM series industrial monitor is installed, the

screen is placed on the working surface. It is therefore important to rest the

MPC industrial workstation on a soft at that cannot damage the LCD screen

on the front of the SRM series industrial monitor.

5.3.2 Voltage Select Jumper Settings

If the monitor comes with both 12V and 9 ~ 36V DC power connectors, the voltage select

jumper on the integrated AD board must be configured for the DC connector that is used

to power the monitor. Refer to Section 4.3.2 for the appropriate jumper settings of the AD

board.

NOTE:

The default voltage select jumper is configured for a 12V power source.

Do not change the jumper setting unless a 9~36V DC power connector

is to be used as the monitor’s power source.

To properly set the voltage select jumper, the following steps must be completed:

Step 1:

Use a screwdriver to remove all the screws holding the rear panel to the monitor.

Step 2:

Remove the rear panel.

Step 3:

Locate the voltage select jumper. (See Section 4.3.2)

Advertising