ODL Add-on/DIY Blinds—raised frame sidelights User Manual

Page 4

Advertising
background image

ENCLOSED TREATMENT INSTALLATION INSTRUCTIONS

3

7

SECURE

Check top, bottom and sides of treatment frame to be sure it is
flush to door. Be certain all lock clips are snug and pushed in fully.

5

HANG

Carefully lift and securely hang the top of the treatment
assembly over the top brackets. Angle the lower unit towards
you while you slide it on. Be certain the brackets are in the slots
at the top, inside edge of the frame. Move side to side to verify
the unit is square and secure.

6

LOCK CLIPS

Press the bottom corners of the treatment assembly
against the door and swing the lock clips in behind
the window frame. They should snap in easily and
stay in place.

Note: The shims provide a gap for the lock clips to
slide into.

4

CLEAN

Stand treatment upright. Fully raise the treatment.
Clean the inside glass of the treatment assembly
and the window on the door.

PUSH

Advertising