Roll up curtain retainer installation, Figure 5 figure 6 – Poly-Tex FieldPro Gothic User Manual

Page 15

Advertising
background image

CC

CD

CE

FIGURE 5

FIGURE 6

1. RAISE CURTAIN ABOUT HALF WAY UP BY TURNING THE HANDLE ON THE
ROLL UP UNIT. LOCATE AND INSTALL CRADLES 24" FROM END OF LOWER
SIDE RAIL ON BOTH ENDS OF THE STRUCTURE AND AT 12' SPACING BETWEEN
CRADLES. MEASURE 3/4" FROM TOP OF SIDE RAIL AND DRILL A 3/8" HOLE.
ATTACH CRADLES USING WOODTIGHT SCREWS AND CARRIAGE BOLT, LOCK
WASHER, AND HEX NUT. FIGURE 5

2. PLACE ROPE BRACKETS ON THE TOP RAIL MIDWAY BETWEEN THE
CRADLES ATTACH USING WOODTIGHT SCREWS. FIGURE 6

3. THREAD ROPE THROUGH THE CRADLES & ROPE BRACKETS, AS SHOWN.
TIGHTEN ROPE AND SECURE TO EACH END BRACKET ASSEMBLY S-HOOK.

ROLL UP CURTAIN RETAINER INSTALLATION

12

REV: AH-120507

POLY NOT SHOWN

12' TY

P

CRADLE ASSEMBLY
WITH S-HOOK

2'

EQUA

L

SPAC

ING

EQUA

L

SPAC

ING

BRACKET ASSEMBLY

WITH S-HOOK

WOODTIGHT
SCREW

WOODTIGHT

SCREWS

1/4" x 3" CARRIAGE BOLT,

LOCK WASHER, & HEX NUT

Advertising