Roll up curtain retainer installation, Figure 5 figure 6 – Poly-Tex FieldPro Gothic User Manual
Page 15

CC
CD
CE
FIGURE 5
FIGURE 6
1. RAISE CURTAIN ABOUT HALF WAY UP BY TURNING THE HANDLE ON THE
ROLL UP UNIT. LOCATE AND INSTALL CRADLES 24" FROM END OF LOWER
SIDE RAIL ON BOTH ENDS OF THE STRUCTURE AND AT 12' SPACING BETWEEN
CRADLES. MEASURE 3/4" FROM TOP OF SIDE RAIL AND DRILL A 3/8" HOLE.
ATTACH CRADLES USING WOODTIGHT SCREWS AND CARRIAGE BOLT, LOCK
WASHER, AND HEX NUT. FIGURE 5
2. PLACE ROPE BRACKETS ON THE TOP RAIL MIDWAY BETWEEN THE
CRADLES ATTACH USING WOODTIGHT SCREWS. FIGURE 6
3. THREAD ROPE THROUGH THE CRADLES & ROPE BRACKETS, AS SHOWN.
TIGHTEN ROPE AND SECURE TO EACH END BRACKET ASSEMBLY S-HOOK.
ROLL UP CURTAIN RETAINER INSTALLATION
12
REV: AH-120507
POLY NOT SHOWN
12' TY
P
CRADLE ASSEMBLY
WITH S-HOOK
2'
EQUA
L
SPAC
ING
EQUA
L
SPAC
ING
BRACKET ASSEMBLY
WITH S-HOOK
WOODTIGHT
SCREW
WOODTIGHT
SCREWS
1/4" x 3" CARRIAGE BOLT,
LOCK WASHER, & HEX NUT