Maintenance, cleaning, and storage, Inspection – Qualcraft Parapet Anchor System User Manual

Page 7

Advertising
background image

Maintenance, Cleaning, and Storage

Repairs to Parapet Anchors can only be made by a Guardian Fall Protection representative or an
entity authorized by Guardian. Contact Guardian for all maintenance and repair needs at:
1-800-466-6385. If a Parapet Anchor fails inspection in any way, immediately remove it from
service, and contact Guardian to inquire about its return or repair.

Cleaning after use is important for maintaining the safety and longevity of Parapet Anchors.
Remove all dirt, corrosives, and contaminants from Parapet Anchors before and after each use. If
Parapet Anchor cannot be cleaned with plain water, use mild soap and water, then rinse and
wipe dry. NEVER clean Parapet Anchors with corrosive substances.

When not in use, store equipment where it will not be affected by heat, light, excessive
moisture, chemicals, or other degrading elements.

KEEP INSTRUCTIONS AVAILABLE FOR REFERENCE. Record Date of First Use.

Prior to EACH use, inspect Parapet Anchor for deficiencies, including, but not limited to, corrosion,
deformation, pits, burrs, rough surfaces, sharp edges, cracking, rust, paint buildup, excessive
heating, alteration, and missing or illegible labels. IMMEDIATELY remove Parapet Anchor from
service if defects or damage are found, or if exposed to forces of fall arrest.

Ensure that applicable work area is free of all damage, including, but not limited to, debris, rot,
rust, decay, cracking, and hazardous materials. Ensure that selected work area will support the
application-specific minimum loads set forth in this instruction manual. Work area MUST be
stable.

At least every 6 months, a Competent Person other than the user must inspect Parapet Anchors.
Competent Person inspections MUST be recorded in inspection log in instruction manual
and on equipment inspection grid label. The Competent Person must sign their initials in
the box corresponding to the month and year the inspection took place.

During inspection, consider all applications and hazards Parapet Anchors have been subjected to.

Inspection

G

ua

rd

ia

n

Fa

ll

Pr

ot

ec

tio

n

6

30

5

S.

2

31

st

S

t.

, K

en

t,

W

A

9

80

32

p

ho

ne

: (

80

0)

4

66

-6

38

5

f

ax

: (

80

0)

6

70

-7

89

2

w

w

w

.g

ua

rd

ia

nf

al

l.c

om

5

Advertising