Ramsey Winch DODGE QM KIT 251074 User Manual
Page 3
6. Cut hole in air dam 3 1/4” wide x 3 1/2” high
(Height of hole will be from bottom of top lip to
top of bottom lip of air dam).
Do not cut through top or bottom lip.
7. Remove bolts from Receiver Assembly (item
#1) and lower it back down.
8. Lift front of Receiver Assembly through hole in
air dam and bolt to Frame Mounting Brackets
(Item #3 & #4) using 3 1/2-13NC x 1 1/4 LG
GR5 Z/P capscrews, nuts (Item #7), and lock
washers (#8) on right and left sides of frame.
9. Torque all bolts to proper torque values (see
chart on following page).
10.Install cover (item #2) into end of receiver
assembly (#1).
Install Receiver Assembly
4. Lift Receiver Assembly (Item #1) into
place and install top rear 1/2-13NC x 1 1/4
LG GR5 Z/P capscrew (item #5) and nut
(item #7) loosely.
Cutting the Air Dam
5. Swing Receiver Assembly up and use to
mark 3 1/4” wide hole in air dam.
3