Floodsafe, Inflow preventer, Passed □ failed – Val-Matic 1-16 in. FloodSafe Inflow Preventer User Manual

Page 6

Advertising
background image

5

FloodSafe

®

Inflow Preventer

TEST AND MAINTENANCE REPORT


OWNER: _________________________________________________________________________________

ADDRESS: _________________________________________________________
_______________________

LOCATION OF ASSEMBLY: ______________________________________
____________________________

MANUFACTURER: _______________
__________ MODEL NO: ____________________________________

YEAR OF MANUFACTURE: _______
________________ SIZE: ____________________________________

PROCEDURE: See “FIELD TESTING THE FLOODSAFE” in the Instruction Manual.
1. Isolation Valve
Under Air Valve

2. Inflow Preventer Test
Lower Chamber

3. Inflow Preventer Test
Upper Chamber

leaked or
closed off tight

test cocks OK or
test cocks replaced
open test cocks

test cock OK or
test cock replaced

Record any maintenance
performed:

Initial

Tests:

Connect test pipe assembly
to test cock A.
Fill lower chamber and test
pipe with clean water.
Maintain water level above
“Minimum Test Level”

Connect test pipe assembly
to test cock B.
Fill upper chamber and test
pipe with clean water.
Maintain water level above
“Minimum Test Level”

Inflow Preventer Basket
removed and cleaned

Observe test cock B for
leakage for 5 minutes.

Observe test cock C for
leakage for 5 minutes.

Any sign of leakage from test
cock is cause for rejection.
Pass Fail

Any sign of leakage from test
cock is cause for rejection.
Pass Fail

Bottom Plug
installed

Repairs:

Record maintenance
performed:

Record maintenance
performed:



Final

Tests

(when

needed):

If initial test failed, repeat 5
minute test. Any sign of
leakage from test cock B is
cause for rejection.
Pass Fail

If initial test failed, repeat 5
minute test. Any sign of
leakage from test cock C is
cause for rejection.
Pass Fail

IMPORTANT: After testing, reopen the isolation valve under the air valve.

NOTE: All repairs and final tests should be completed within five (5) working days.

COMMENTS: _____________________________________________
__________________________________

______________________________________________________________________
_____________________

I hereby certify that this data is accurate and reflects the proper maintenance of the assembly.

TESTER: ____________________
_________ CERT No. __________________ DATE: __________________

TIME: ______
_____________

THIS ASSEMBLY:

□ Passed □ Failed

Advertising