En g l is h english – Pfister GT49-YP0Y User Manual

Page 3

Advertising
background image

E

N

G

L

IS

H

ENGLISH

ENGLISH

9

10

7

8

7 VALVE BODY ATTACHMENT

Remove Clip (7A) from Valve Body (7B) and save. From above sink, insert Valve Body
(7B) through Mounting Holes (7C). The HOT valve, labeled with Red Tag (7D), should
be positioned to the left side of the spout.

8 VALVE BODY INSTALLATION

Before proceeding, Valve Stems (8A) are to be set in the closed position. From
underneath sink, place Square Washer (8B) onto Valve Shank (8C) and tighten loosely
with Mounting Nut (8D). Temporarily place Handle (8E) onto Valve Stem (8A) to make
sure the handle levers are properly aligned to sink. Remove Handle (8E) and tighten
Mounting Nut (8D) until Valve Body (8F) is fi rmly secured to sink.

Do not use Handles (8E) to tighten or to rotate Valve Bodies (8F)!

9 HANDLE ATTACHMENT

Place Plastic Seal Rings (9A) against the bottom of Handle Hubs (9B). Connect Handles
(9C) onto Valve Adapters (9D).

10 SECURING HANDLES

Be sure Valves and Levers are in the "OFF" position. Secure handles by holding the
Lever (10B) in place and tighten the Hubs (10A) by rotating them in a clockwise direction.
To remove handles, rotate Hubs (10A) in a counterclockwise direction.

3

9C

9B

9A

9C

9A

9B

7B

8E

7A

7B

7B

7D

7C

7C

10B

8E

8A

8F

8C

8B

8D

8D

8B

8F

8C

8A

9D

9D

10A

Advertising
This manual is related to the following products: