Equipment start-up – Sterling HS User Manual

Page 24

Advertising
background image

Customer ____________________________________ Job Name & Number _________________________

PRE-INSPECTION INFORMATION

With power and water/steam off.

Type of Equipment:

Unit Heater

Serial Number

_________________________ Model Number __________________________

Name Plate Voltage:

_____________

Name Plate Amperage: _____________

Steam

Hot

Water

Rating: _

_____ BTU @ ____ °F

_ _____ kw @ ____ °C

❐

Are all panels in place?

❐

Has the unit suffered any external damage?

Damage ______________________________

❐

Does the piping and electric wiring appear to be installed in a professional manner?

❐

Has the piping and electric been inspected by the local authority having jurisdiction?

❐

Is the supply properly sized for the equipment?

❐

Were the installation instructions followed when the equipment was installed?

❐

Have all fi eld installed controls been installed?

❐

Do you understand all the controls on this equipment? If not, contact your wholesaler or rep.

(DO NOT START this equipment unless you fully understand the controls.)

EQUIPMENT

START-UP

Advertising