Gas equipment start-up – Sterling QVSF User Manual

Page 32

Advertising
background image

Customer ____________________________________ Job Name & Number _________________________

PRE-INSPECTION INFORMATION

With power and gas off.

Type of Equip:

Unit Heater

Duct Furnace

Indoor

Rooftop

Serial Number

_________________________ Model Number __________________________

Name Plate Voltage:

_____________

Name Plate Amperage: _____________

Type of Gas:

Natural

LP

Tank Capacity _______ lbs.

Rating: _ _____ BTU @ ____ °F

_______ kg

_ _____ kw @ ____ °C

❐

Are all panels, doors, vent caps in place?

❐

Has the unit suffered any external damage?

Damage ______________________________

❐

Does the gas piping and electric wiring appear to be installed in a professional manner?

❐

Has the gas and electric been inspected by the local authority having jurisdiction?

❐

Is the gas supply properly sized for the equipment?

❐

Were the installation instructions followed when the equipment was installed?

❐

Have all fi eld installed controls been installed?

❐

Do you understand all the controls on this equipment? If not, contact your wholesaler or rep.

(DO NOT START this equipment unless you fully understand the controls.)

GAS EQUIPMENT

START-UP

GENERAL

With power and gas off.

❐

Make certain all packing has been removed.

❐

Tighten all electrical terminals and connections.

❐

Check damper linkages for tightness.

❐

Check all fans & blowers for free movement.

❐

Check all controls for proper settings.

❐

Check all set screws on blowers and bearings.

❐

Check belt tightness.

BLOWER

With power on and gas off.

❐

Check voltage L1 _____ L2 _____ L3 _____

❐

Check rotation of main blower.

❐

Check motor amps L1 _____ L2 _____ L3 _____

❐

Blower RPM _____________

❐

Check air fi lters. (Record quantity & size.)

Remarks:

___________________

________________________
________________________

GAS HEATING

With power and gas on.

❐

Inlet gas pressure.

____ in. W.C. or ____ kPa

❐

Pilot & main burner ignition.

❐

Manifold gas pressure. ____ in. W.C. or ____ kPa

❐

Cycle fi restat and/or freezestat.

❐

Check electronic modulation. Set at: __________

❐

Cycle and check all other controls not listed.

❐

Check operation of remote panel.

❐

Entering air temp. _____ °F or ____ °C

❐

Discharge air temp. (high fi re) ____ °F. or ____ °C

❐

External static pressure _________ in. W.C.

❐

Cycle by thermostat or operating control.

32

260 NORTH ELM ST., WESTFIELD, MA 01085

TEL: (413) 568-9571 FAX: (413) 562-8437

www.mestek.com