Preparing the rack for server installation – Acer Altos G5450 Series User Manual

Page 141

Advertising
background image

123

Preparing the rack for server installation

1

Install eight distands into the vertical rails of the system rack.

2

Adjust the front bracket to the preferred length.

(1) Turn the captive thumbscrews counterclockwise to loosen

them.

(2) Slide the front bracket to the preferred length.

(3) Secure the front bracket in its preferred position by turning

the captive thumbscrews clockwise.

Do the same thing to the other front bracket.

Advertising