Make sure systems are level – Hired-Hand RollSeal Sidewall System (Curtain): SideWall Curtain User Manual

Page 11

Advertising
background image

Part No. 4801-5072 Rev 9-08

SideWall Curtain

Page 11

8.6

Fasten Sidewall Curtain Systems to Boards

After completing Section 8.1 through Section 8.5, the system will consist of all vertical members
and all bottom channels fastened together as an assembly. The assembly should have freedom of
movement since screws have not been tightened.

1. Refer

to

Fig. 8. Use a level to make sure that sidewall systems are level.

Make any required adjustments.


2.

Check that vertical members at the left end and right end of the opening are plumb.
Make any required adjustments.

3.

Tighten all screws holding assembly to 2"x 6" boards.


4.

Attach self-drilling lag screws through all remaining drill holes of vertical members and
bottom channels to securely fasten the assembly to 2"x 6" boards.




































Figure 8

Make sure systems are level.

Make sure that vertical members
are plumb. To determine this,
check that left track and right
track are plumb.

After checking that systems are
plumb and level, fasten systems to
the 2"x 6" boards by tightening self-
drilling lag screws.

Install all remaining screws through
screw holes of right track, center
tracks, left track, and bottom
channels.

Advertising